Changsha City, Hunan Province, China 7×24 Technical Support

220 3 Phase Power Meter​

Explore our range of 220V 3 phase power meters for low-voltage commercial, industrial and energy-management systems. Choose direct-connected models for circuits within the meter’s rated current or CT-operated versions for larger feeders and retrofit installations. Options are available for three-phase three-wire and three-phase four-wire networks, including common 220/380V and 230/400V configurations.
Depending on the model, users can monitor voltage, current, frequency, active and reactive power, apparent power, power factor, demand, kWh and kvarh. The collection includes compact DIN-rail meters and panel-mounted instruments with LCD displays, pulse outputs, RS485 Modbus RTU, Wi-Fi, bidirectional metering and harmonic analysis. Compare wiring type, current range, CT ratio, accuracy class, communication method and certification before selecting a meter. Always confirm whether the stated 220V is phase-to-neutral or phase-to-phase at the installation site.

Application Industries

Commercial Buildings

Energy monitoring for offices, shopping malls and commercial facilities.

Industrial Facilities

Power distribution and energy management for factories and production plants.

Utilities

Reliable metering for power generation, transmission and distribution.

Renewable Energy

Energy measurement and monitoring for solar, wind and clean energy systems.

Residential

Smart energy metering solutions for homes and residential communities.

Frequently Asked Questions

Yes. In a common 220/380V four-wire wye system, the voltage from any phase to neutral is approximately 220V, while the voltage between two phases is approximately 380V. Some regions also use three-phase systems in which 220V is measured phase to phase. Because these configurations require different meter connections, verify the actual line-to-line voltage, line-to-neutral voltage and neutral arrangement before ordering.

On a 220/380V wye system, a 220V single-phase load is normally connected between one phase and neutral. On a 220V delta system, the phase-to-phase voltage may already be 220V, but a neutral conductor may not be available. A transformer may be required when the supply configuration does not provide the voltage needed by the load. All connections should follow local electrical codes and be completed by a qualified electrician.

The capacity depends on the metering method and the model’s rated current. Direct-connected meters commonly cover loads up to 60A, 80A or 100A per phase. Higher-current feeders normally require a CT-operated meter with correctly sized current transformers. The meter rating does not replace cable, breaker or busbar calculations, so the complete circuit must be designed for the maximum continuous load and applicable safety margin.

A three-phase meter samples the required phase voltages and currents, then calculates power and accumulated energy. For a balanced system, active power can be approximated as √3 × line voltage × line current × power factor. A multifunction meter measures each phase individually, providing more reliable results when loads are unbalanced. Correct phase sequence, CT orientation, CT ratio and voltage-terminal wiring are essential for accurate readings.

Use a three-phase four-wire meter when the system includes L1, L2, L3 and neutral, as is typical for 220/380V wye networks. A three-phase three-wire meter is intended for systems without a neutral. You must also choose between direct wiring and CT operation. Match the meter diagram to the distribution system and confirm whether the current inputs require direct conductors, paired CTs, or standard 1A or 5A CT secondaries.

Confirm the line and phase voltages, wiring configuration, maximum current, metering direction and required accuracy class. For CT models, check the CT primary and secondary ratings as well as conductor opening size. Buyers should also compare DIN-rail or panel mounting, LCD readability, RS485 Modbus or Wi-Fi connectivity, pulse outputs, bidirectional measurement, tariff functions and relevant MID, CE or IEC compliance. Installation accessories and communication modules can also affect the total price.

Get in touch with us

Please fill out the form below, and we will get back to you as soon as possible.

WhatsApp WhatsApp QR Code Scan WhatsApp Email Facebook